Post-Tensioned Concrete Bridges. A Comparison of Post-Tensioning Methods for Concrete Bridges, Givin
Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Post-Tensioned Concrete Bridges. A Comparison of Post-Tensioning Methods for Concrete Bridges, Givin

Tag
Author
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Citation

The Structural Engineer, Volume 71, Issue 23, 1993

Date published

N/A

Citation

The Structural Engineer, Volume 71, Issue 23, 1993

Price

Standard: £10 + VAT
Members/Subscribers: Free

Grouted post-tensioned concrete as a bridging material is compared with alternative choices for regularly occurring situations. Some examples are presented, and a commentary on comparative performance is included. Grouting of tendons is dealt with in some detail covering the development of current methods, design criteria, details, and inspection methods. The paper draws some tentative conclusions on the future of the
material.

M.V. Woolley and G.M. Clark

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 23/24

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Serving and protecting the profession In our column for 19 October, Hugh Woodrow, Chief Executive of the Association of Consulting Engineers, drew attention to the services provided by the ACE to chartered engineers, including structurul engineers, in private practice. This was in response to the need which had been expressed in a letter by Ken Burr (l7 August) for ‘a trading organisation representing the chartered structurul engineer in business’. Mr Burr responds as follows: It is interesting that Hugh Woodrow should respond to my recent letters under this heading. I took the opportunity to telephone ACE to discover whether it provides the type of service I feel is needed by me in particular and to members in private practice in general. The answer is a clear NO. The prime reason is that, to join ACE, applicants need to be either Fellows of the Institution or agree to seek election to Fellowship within 5 years. This could start another debate, but I for one cannot see the advantages of seeking Fellowship of the Institution. Also the interests of ACE are too diverse. It invites membership from about 14 Institutions and appears to be expanding this to include non-chartered engineers, yet has a membership of only about 700 firms. Mr Halstead is clearly a member of ACE and seems to think that so are we all. Verulam

Price – £10
The Structural Engineer
<h4>To Certify, or Not</h4>

To Certify, or Not

The question is, what is the legal effect of using the word ‘certify’ as opposed to some other wording such as ‘to the best of my knowledge and belief or ’in my professional opinion’? J.A. Welsh

Price – £10
The Structural Engineer
<h4>The Use of External Tendons for the Bangkok Second Stage Expressway</h4>

The Use of External Tendons for the Bangkok Second Stage Expressway

External, unbonded tendons have attracted much attention recently, while internal, bonded tendons have come into criticism and are going out of favour. It is important in future projects where external tendons are going to be used that suitable details and techniques are developed to give the desired strength and durability. A lot can be learnt from the way external tendons are used in other parts of the world, where the feature is more common. This paper describes the design of the Bangkok Second Stage Expressway which is currently under construction using the latest techniques developed in the United States and France and is one of the largest ever uses of external tendons for a viaduct project. N.R. Hewson

Price – £10