Freestanding, Lightweight Mezzanine Floors

Author: Anderson, I

Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Freestanding, Lightweight Mezzanine Floors

Tag
Author
Anderson, I
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Anderson, I

Citation

The Structural Engineer, Volume 74, Issue 8, 1996

Date published

N/A

Author

Anderson, I

Citation

The Structural Engineer, Volume 74, Issue 8, 1996

Price

Standard: £10 + VAT
Members/Subscribers: Free

The subject of mezzanine floor design/detailing (raised in the Verulam column for 21 November 1995) has exercised my brain for some years, and some elementary rules emerged by agreement with fabricators and the local authority I worked for at the time. It was apparent that two of the fabricators were not structural engineers and used safe-load tables/computer programs for their sizing of members. In most cases the
floor comprised 38mm chipboard deck on cold-rolled purlins sitting on main beams or, more usually, cleated to main beam webs. The main beams were supported on cap plates to RHS columns on base plates bolted to an existing groundslab.

I. Anderson

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Technical Issue 8

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Educating engineers Melvin Hurst, writing from Abu Dhabi, wonders whether the balance between research and teaching in universities is really in the best interest of a profession and writes: In your editorial comment following Professor Jenkins’s contribution (5 December 1995) you invited opinions on the problems faced by academics when having to choose between research and teaching practical engineering themes. Verulam

Price – £10
The Structural Engineer
<h4>Glaxo Wellcome Medicines Research Centre, Stevenage: Anatomy of the Design Process</h4>

Glaxo Wellcome Medicines Research Centre, Stevenage: Anatomy of the Design Process

It is easy to take the advantages of drugs available today almost for granted, but an enormous amount of effort is required to discover and develop a successful new drug. In fact, only something like one in 4000 new chemical entities synthesised and evaluated will become a marketable product. The scale of this research and development work, combined with growing concern about occupational safety and environmental protection, has increased the need for effective modem laboratory facilities. M.A. Barrie and A. Jefcoat

Author – Barrie, M A;Jefcoat, A
Price – £10
The Structural Engineer
<h4>Discussion on The Hong Kong Stadium by P.G. Ayres, R.N. Cole and R. Forster</h4>

Discussion on The Hong Kong Stadium by P.G. Ayres, R.N. Cole and R. Forster

Mr P. J. Ayres (M) I have three questions about the steelwork, first of all the connections. Who was responsible for all connection design and how did you control particularly the appearance of the connections? How much architectural involvement was there, including the pin connection?

Price – £10