Moving structures - jacked tunnels on the Central Artery, Boston, USA

Author: Powderham, Alan;Taylor, Steve;Winsor, Derek

Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Moving structures - jacked tunnels on the Central Artery, Boston, USA

Tag
Author
Powderham, Alan;Taylor, Steve;Winsor, Derek
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Powderham, Alan;Taylor, Steve;Winsor, Derek

Citation

The Structural Engineer, Volume 81, Issue 18, 2003

Date published

N/A

Author

Powderham, Alan;Taylor, Steve;Winsor, Derek

Citation

The Structural Engineer, Volume 81, Issue 18, 2003

Price

Standard: £10 + VAT
Members/Subscribers: Free

To ease some of the worst urban traffic congestion in the USA, the Central Artery Project (C/AT) in Boston, Massachusetts, involves relocating much of the city’s main highway network underground. Known locally as the ‘Big Dig’, it is a landmark project in urban infrastructure redevelopment1,2. It is scheduled for full completion in 2005 but with many of the new sections now operational it is already revitalising the city and establishing a more sustainable future for its citizens. It was essential to minimise disruption during construction and the alternative of tunnel jacking provided a key solution to this need. The jacked tunnels comprise by far the largest, most complex project of this type in the world, with each box structure well over 10 times the size of any jacked tunnels previously attempted in the USA. Introducing a wide range of innovation, the tunnel jacking has delivered a low maintenance, robust construction while adding important environmental advantages and contributed to over US$300m in construction savings3. From concept to completion of the tunnel jacking in 2001, required over a decade of sustained development and close teamwork. The official opening of the section of interstate highway section that includes the jacked tunnels was celebrated on 17 January 2003. This paper provides an overview of the tunnel jacking and focuses on the key structural aspects and the innovations involved.

Alan Powderham, FREng, FICE, MIStructE Mott MacDonald

Steve Taylor, MICE, MIStructE, PE (Structural) Hatch Mott MacDonald

Derek Winsor, MICE, MIStructE, PE (Structural) Mott MacDonald

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 18

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Price – £10
The Structural Engineer
<h4>The last few miles...</h4>
The Structural Engineer
<h4>INTEGER Hong Kong pavilion</h4>

INTEGER Hong Kong pavilion

This paper describes a pavilion structure designed as part of a project to promote innovation in residential development in Hong Kong. The pavilion exhibited two apartment ‘building blocks’ or modules intended for use in the sustainable construction of multi-storey residential towers. The INTEGER organisation was commissioned to design an exhibition which would not only demonstrate sustainability but would also explain how new ideas could be used to raise the quality of the built environment. The INTEGER team decided that it was important to design and construct the pavilion itself using sustainability principles. The paper explains how this was achieved and how it took into account local conditions and local skills. The background to the project and the exhibition concept together with the engineering design concepts which were adopted in the design of the pavilion are also described. The end result was a dramatic addition to the Hong Kong Island waterfront at Tamar comprising a comprehensive multi-media exhibition and two apartments known as ‘flats of the future’. R. E. Slade, BSc, CEng, FIStructE WSP Cantor Seinuk, London R. Stephens, BEng, CEng, MIStructE Formerly of WSP Group, Hong Kong

Author – Slade, R E;Stephens, R