Contracting party insolvency - a rough guide

Author: P. Westlake (Browne Jacobson)

Date published

28 February 2014

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Contracting party insolvency - a rough guide

Tag
Author
P. Westlake (Browne Jacobson)
Date published
28 February 2014
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

P. Westlake (Browne Jacobson)

Citation

The Structural Engineer, Volume 92, Issue 3, 2014, Page(s) 2

Date published

28 February 2014

Author

P. Westlake (Browne Jacobson)

Citation

The Structural Engineer, Volume 92, Issue 3, 2014, Page(s) 2

Price

Standard: £10 + VAT
Members/Subscribers: Free

Despite grounds for optimism in the UK economy, Peter Westlake advocates a mindful approach during contract preparation, to mitigate potential issues.

Additional information

Format:
PDF
Pages:
2
Publisher:
The Institution of Structural Engineers

Tags

Issue 3

Related Resources & Events

The Structural Engineer
<h4>Steel Bridges: Conceptual and Structural Design of Steel and Steel-Concrete Composite Bridges (book</h4>

Steel Bridges: Conceptual and Structural Design of Steel and Steel-Concrete Composite Bridges (book

Matthew Myerscough comments on a book by two steel bridge experts.

Date – 28 February 2014
Author – M. Myerscough (Cass Hayward)
Price – Free
The Structural Engineer
<h4>Verulam (readers' letters)</h4>

Verulam (readers' letters)

Letters in this issue include discussion on scaffolding guidance, design failures and Verulam's role...

Date – 28 February 2014
Author – Various
Price – £10
The Structural Engineer
<h4>FPS E-Pile Schedule for Eurocode design</h4>

FPS E-Pile Schedule for Eurocode design

The introduction of Eurocodes has altered the format of pile loading information and the procedures with which the structural and geotechnical design resistances for piles are determined. The E-Pile Schedule has been developed by the UK Federation of Piling Specialists (FPS) to accommodate the latest Eurocode requirements for loading on foundations. This article highlights the considerable benefits of adopting a standard pile schedule for Eurocode design.

Date – 28 February 2014
Author – D. Selemetas and A. Bell (Cementation Skanska, UK)
Price – £10