Joint Meeting with ICE - Luton DART Project

The presentation will describe the engineering and construction challenges involved in the Luton DART Project. These range from tunneling adjacent to and underneath a live taxiway, maneuvering a prefabricated bridge along a dual carriage to lift onto abutments and a 10m high viaduct running parallel to a live railway, all of which must be completed without interrupting the day to day operations of the airport.
 
The presentation will follow the same journey the eventual passengers of the Luton DART will take whilst showing the complex challenges the team have and are currently facing.
 
Due to the varying landscape of the site the railway will start from adjacent to the current Luton Parkway National Rail Station, travel across a seven-pier viaduct and over the A1081 Airport Way on a steel girder bridge. It then runs at ground level adjacent to the main runway before entering a cut and cover tunnel underneath taxiway bravo, finally arriving into Central Station where passengers disembark to the terminal.
 
We will also cover the great work being done to implement BIM level 2 on the project whilst digitising quality and H&S paperwork that will improve record keeping and compliance.
 
 

Event Information

Event Status
Places Available

Event Date
24/04/2019

Time
18:00 for 18:30 start

Price
Free

Location
Box End Park, Kempston, Beds, MK43 8RW

Event Association
DART Project Team Member

Event Contact
Agnieszka Nash

Event Contact Email
agnieszkanash@gmail.com


Regional Group
Bedfordshire and adjoining counties





All of the pages on this website are the copyright © of The Institution of Structural Engineers.

The Institution of Structural Engineers, International HQ, 47-58 Bastwick Street, London, EC1V 3PS, United Kingdom
Tel: +44 (0)20 7235 4535 Fax: +44 (0)20 7235 4294
Registered with the Charity Commission for England and Wales No. 233392 and in Scotland No. SC038263
Follow us on: Twitter Facebook LinkedIn Youtube The Structural Engineer Jobs