The session will be an opportunity to understand how the material performs in comparison to traditional concrete with an interactive display, following a short talk by Curtins’ experienced structural engineers.
Curtins have acted as one of the UK’s leading engineers on RAAC, carrying out surveys in over 100 schools in the past 6 months, as well as universities, hospitals and other public and private sector buildings. Their expertise has contributed to IStructE guidance, as well as collaborative research with the BRE, Loughborough University and Aintree and Airedale Hospitals.
Join us in the central atrium at the Leeds College of Building’s South Bank Campus for refreshments and introductory presentations, before breaking out into the College’s workshop spaces for live testing of RAAC samples
6.00-6.30pm: Refreshments
6.30-7.15pm: Presentations
7.15-7.45pm: Live RAAC Testing
7.45-8.15pm: Interactive RAAC Exhibition & Networking
Andy Buckley MIStructE
Design Director, Andy Buckley is responsible for leading the Structures Team in Curtins’ Leeds office. Andy has led the teams that have contributed to the RAAC assessments undertaken at Airedale General Hospital and York and Scarborough Teaching Hospitals. Andy is professionally registered with the IStructE on their approved RAAC Register.
Oliver Organ CEng
Associate, Oliver Organ is a Team Leader in Curtins Leeds office. He is considered a leading Engineer in RAAC and is currently the Project leader responsible for the delivery and implementation of Curtins’ Structural works at Airedale General Hospital.