The Structural Engineer > Archive > Volume 30 (1952) > Issues > Issue 6 > The Construction of the Temple Barrage on the River Lot
Name of File 2140-30-06.pdf cached at 14/12/2017 00:32:23 - with 8 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\33\33310dd7-025b-412d-b793-bb278efd2965.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\33310dd7-025b-412d-b793-bb278efd2965_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 33310dd7-025b-412d-b793-bb278efd2965_1.png

Members/subscribers must be logged in to view this article

The Construction of the Temple Barrage on the River Lot

The first part of this paper describes the utilisation of " low-head " installations in the development of the hydro-electric resmrces of France, with a description of the principles and construction of the Stream-line Power Station Barrage recently completed at Templesur-Lot (Electricite de France). L.P. Brice

Author(s): Brice, L P

Keywords: temple-sur-lot, france;dams;tunnelling;nentilla tunnel, aude, france;power stations