The Structural Engineer > Archive > Volume 34 (1956) > Issues > Issue 1 > Steelwork in Transit Shed 102 Southampton Docks
Name of File 2296-34-01.pdf cached at 11/12/2017 22:51:49 - with 17 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\aa\aa7d92d9-f614-41cf-a34c-ce3ee99e48bf.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\aa7d92d9-f614-41cf-a34c-ce3ee99e48bf_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: aa7d92d9-f614-41cf-a34c-ce3ee99e48bf_1.png

Members/subscribers must be logged in to view this article

Steelwork in Transit Shed 102 Southampton Docks

The subject of this paper is the structural steel framework in the British Transport Commission’s new Transit Shed 102 at Southampton Docks. This building contains provisions for both passenger and cargo traffic and will be the main ocean terminal of the Union-Castle Mail Steamship Co. Ltd.’s service to and from South Africa. F. M. Bowen and B. E. S. Ranger

Author(s): Bowen, F M;Ranger, B E S

Keywords: transit shed 102, southampton, hants;steel;frames;long span;roofs;welds;design;manufacturing;load tests;full scale tests