The Structural Engineer > Archive > Volume 44 (1966) > Issues > Issue 5 > Building High in a Typhoon Zone - Hang Seng Bank, Hong Kong
Name of File 2985-44-05.pdf cached at 15/12/2017 06:33:42 - with 11 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\4c\4cd376f5-b0c4-4b5a-b9ef-06dd1fae1199.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\4cd376f5-b0c4-4b5a-b9ef-06dd1fae1199_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 4cd376f5-b0c4-4b5a-b9ef-06dd1fae1199_1.png

Members/subscribers must be logged in to view this article

Building High in a Typhoon Zone - Hang Seng Bank, Hong Kong

The paper is intended to provide an outline of the design, analysis, construction and erection of a 22-storey, all-welded, steel-framed building having no structural walls and subject to typhoon conditions. T.V. Thompson

Author(s): Thompson, T V

Keywords: hang seng bank, hong kong;multistorey buildings;frames;steel;hurricanes;design;foundations;piling