The Structural Engineer > Archive > Volume 49 (1971) > Issues > Issue 8 > Discussion Whitgift Centre, Croydon by W.E. Grainger and T.G. Hancock
Name of File 3300-49-08.pdf cached at 13/12/2017 09:23:38 - with 5 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\01\016ac133-eed4-4611-a26c-e804a68e9020.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\016ac133-eed4-4611-a26c-e804a68e9020_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 016ac133-eed4-4611-a26c-e804a68e9020_1.png

Members/subscribers must be logged in to view this article

Discussion Whitgift Centre, Croydon by W.E. Grainger and T.G. Hancock

Mr. A. Spruce (M): The main construction problems facing the contractor on this project were those associated with the ground conditions and with the interesting features of the construction.