The Structural Engineer > Archive > Volume 50 (1972) > Issues > Issue 4 > Correspondence Notes on a Failure; Wood-wooI Slabs used as Permanent Formwork by T.R. Hall
Name of File 3352-50-04.pdf cached at 15/12/2017 13:43:49 - with 1 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\94\9412a5fe-4cb3-4b43-a35c-6d065c318ceb.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\9412a5fe-4cb3-4b43-a35c-6d065c318ceb_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 9412a5fe-4cb3-4b43-a35c-6d065c318ceb_1.png

Members/subscribers must be logged in to view this article

Correspondence Notes on a Failure; Wood-wooI Slabs used as Permanent Formwork by T.R. Hall

In the January issue of The Structural Engineer, p. 28, there was a report on the damage to a 7-storey office block in Belfast caused by a bomb attack. This report has been interpreted by some engineers as an indictment against permanent wood-wool formwork, which is unfortunate.