Name of File 3660-54-10.pdf cached at 11/12/2017 06:01:10 - with 6 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\fc\fce20b20-4306-4fa1-a839-46536836067e.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\fce20b20-4306-4fa1-a839-46536836067e_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: fce20b20-4306-4fa1-a839-46536836067e_1.png

Members/subscribers must be logged in to view this article

The Use of Continuous Precast Beam Decks for the M11 Woodford Interchange Viaducts

The paper describes how various factors peculiar to the site together with a desire to impose maximum design and construction standardization led to the use of precast MOT/C&CA prestressed concrete M beams for the decks of a large multi-viaduct interchange at the London end of the M11 motorway. B.P. Pritchard

Author(s): Pritchard, B P

Keywords: continuous structural members;precast;prestressed concrete;motorways;mbeams;decks;design;construction work