The Structural Engineer > Archive > Volume 55 (1977) > Issues > Issue 2 > TP1: The Construction of Gas Treatment Platform No. 1 for the Frigg Field for Elf-Norage A/S
Name of File 3698-55-02.pdf cached at 17/12/2017 00:14:54 - with 13 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\4c\4caab5ca-acb4-4596-9957-aa61136e7b4a.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\4caab5ca-acb4-4596-9957-aa61136e7b4a_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 4caab5ca-acb4-4596-9957-aa61136e7b4a_1.png

Members/subscribers must be logged in to view this article

TP1: The Construction of Gas Treatment Platform No. 1 for the Frigg Field for Elf-Norage A/S

The paper describes the construction at Ardyne Point, Argyll, Scotland, of the first gravity concrete structure to be built in Scotland for the North Sea oil and gas fields, Gas Treatment Platform 1 for the Frigg Fieldof Elf-Norge A/S. Brief descriptions of the Frigg Field and of the basic structure are given and the environmental conditions for which it has been designed. J.A. Derrington

Author(s): Derrington, J A