Name of File 4603-61-04.pdf cached at 12/12/2017 10:28:14 - with 5 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\4f\4f8f6628-968e-4644-9861-c790f8b1a3f9.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\4f8f6628-968e-4644-9861-c790f8b1a3f9_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 4f8f6628-968e-4644-9861-c790f8b1a3f9_1.png

Members/subscribers must be logged in to view this article

The Design and Construction of the River Stour Bridge, Wimborne Bypass

Practical design and construction procedures are outlined for a three-span continuous composite bridge deck, incorporating the use of curved plate girders and high strength concrete using cement/PFA replacement. T. Walter Reed