The Structural Engineer > Archive > Volume 64 (1986) > Issues > Issue 6 > Discussion on P1/P2 Interchange, Hong Kong by R. McGowan and J.P. McCafferty
Name of File 4885-64-06.pdf cached at 18/12/2017 14:43:27 - with 4 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\68\687115fd-b900-430e-af75-6bffdcbb4ea4.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\687115fd-b900-430e-af75-6bffdcbb4ea4_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 687115fd-b900-430e-af75-6bffdcbb4ea4_1.png

Members/subscribers must be logged in to view this article

Discussion on P1/P2 Interchange, Hong Kong by R. McGowan and J.P. McCafferty

Mr K. L. Weir (Scott Wilson Kirkpatrick & Partners): The bridge section in the SWK Basingstoke office was also engaged in the design of a bridge for SWK Hong Kong at the same time that SWK Glasgow was preparing the design for the P1/P2 Interchange.