Name of File 5954-74-05.pdf cached at 13/12/2017 05:09:55 - with 5 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\19\19a15e3a-3752-4dae-946a-f30b8cc69a18.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\19a15e3a-3752-4dae-946a-f30b8cc69a18_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 19a15e3a-3752-4dae-946a-f30b8cc69a18_1.png

Members/subscribers must be logged in to view this article

The Ridgeway Footbridge

Following a brief description of the Kings Langley and Berkhamsted Bypass schemes, the design and analysis of the Ridgeway Footbridge is considered. Matters relating to the structural form, vibration and compression elements design are discussed, as are buildability and issues relating to the bearings at the springings. S.B. Willoughby

Author(s): Willoughby, S B

Keywords: footbridges;ridgeway footbridge, herts;chalk;arch bridges;design;analysis;buildability;vibration;bearings;jacking