The Structural Engineer > Archive > Volume 75 (1997) > Issues > Issue 15 > Planning Supervisors and the Work of the IstructE CDM Task Group
Name of File 6140-75-15.pdf cached at 13/12/2017 03:39:42 - with 2 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\57\57af661d-cdee-477e-88f9-3cf242786830.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\57af661d-cdee-477e-88f9-3cf242786830_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 57af661d-cdee-477e-88f9-3cf242786830_1.png

Members/subscribers must be logged in to view this article

Planning Supervisors and the Work of the IstructE CDM Task Group

Members will no doubt be aware that, some while ago, an Institution ‘CDM Task Group’ was formed to examine ways in which information and advice on the CDM Regulations could be disseminated to members. To gauge the needs of members in this respect, workshops have been held by several local branches of the Institution, and the results of these are currently being assessed; it is envisaged that areas of concern, as expressed by those present at the workshops, will be addressed through the pages of The Structural Engineer in the near future. In the meanwhile, however, some of the most frequently expressed areas of concern are addressed below. M.J. Stokes

Author(s): Stokes, M J

Keywords: cdm;planning supervisors;law;guides;contractors;insurance;responsibilities;roles