The Structural Engineer > Archive > Volume 78 (2000) > Issues > Issue 16 > Australia Stadium: for the Olympics and Beyond
Name of File 6522-78-16.pdf cached at 17/12/2017 14:01:37 - with 4 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\b2\b2a57da3-0eff-4af8-952a-a32f73d51511.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\b2a57da3-0eff-4af8-952a-a32f73d51511_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: b2a57da3-0eff-4af8-952a-a32f73d51511_1.png

Members/subscribers must be logged in to view this article

Australia Stadium: for the Olympics and Beyond

‘Almost a decade ago we decided to put together a first-class team of engineers to try to win the bid to design the Sydney Olympic stadium,’ says Ian Thompson, Director of Sinclair Knight Merz (UK) Ltd. ‘We formed a joint venture partnership with contractors Multiplex and architects HOK Lobb. But we lacked a competitive edge when it came to designing lightweight canopy structures’. Through architects HOK Lobb, Stephen Morley and his young practice in London were approached to join the consortium. Thompson had heard a lot about the young structural engineer, Stephen Morley, who was responsible for the MacAlpine stadium roof and other notable lightweight steel structures while he was with Anthony Hunt and Modus Consultants. The SKM/More1y alliance was forged during the design of the Olympic Stadium. In 1999, by mutual agreement, SKM acquired Modus Consultants for whom Morley was working, and immediately opened a London ofice to establish their European base and to look for stadium design work opportunities in the Americas. David Bennett

Author(s): Thompson, I

Keywords: stadia;canopy roofs;light;steel structures;tiers;foundations;prestressed concrete;trussed roofs;design;construction work