Name of File 1490-08-02.pdf cached at 17/12/2017 19:39:43 - with 20 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\0e\0ea90953-a80d-4952-bd0b-dea85a5db04f.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\0ea90953-a80d-4952-bd0b-dea85a5db04f_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 0ea90953-a80d-4952-bd0b-dea85a5db04f_1.png

Members/subscribers must be logged in to view this article

Welding (Part II)

(l) Ship Construction (and .Appendix I). (2) Boiler Construction. (3) Boiler and Ship Repairs. (4) Railways and Tramways. (5) Steel Structures (and Appendixes 2A, 2B and 2C). (6) Masts and Towers. (7) Reinforced Concrete Construction. (8) Pipe Line Construction. (9) Construction of Tanks and Gas Holders. (10) Fabricated Construction of Machines. (11) Miscellaneous Repairs. Appendix (1) Example of an all Electrically Welded Barge. (2A) Welded Construction in England, 1920/21. (2B) Welded Construction in Europe+ (2C) Welded Construction in U.S.A.+ (3A) Summary Results of Tests. (3B) A.W.P. Tests of Ducol Steel Joints. (3C) Note re Welding Tests. (4) Other relative papers and reports by the Author. Major James Caldwell

Author(s): Caldwell, James