Name of File 301-81-15.pdf cached at 15/12/2017 21:46:50 - with 6 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\19\196b3640-310c-4f34-83ba-3db9c2682f63.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\196b3640-310c-4f34-83ba-3db9c2682f63_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 196b3640-310c-4f34-83ba-3db9c2682f63_1.png

Members/subscribers must be logged in to view this article

Caisson fabrication and launching

The Jurong Island formed by the amalgamation of seven existing islands off Jurong was an attempt by the Singapore Government to create a world class petroleum and chemical industry on the island. The design and construction of a road link to connect the Jurong Island to the mainland was completed with a series of precast gravity caissons. The foundation of the caissons consisted of a layer of stone sill on prepared seabed using dredging. In view of the short overall contract period (24 months), it was most important to ensure that the 96 reinforced concrete caissons be fabricated and installed on time without causing any delay to the subsequent activities such as sand filling which was forming the core of the causeway. Based on the detailed scheduling, it required 12 months to fabricate the 96 caissons. Therefore special fabrication and launching methods were used to overcome the extremely short construction period. This paper describes the construction methods adopted in this project for the fabrication, moving and launching of reinforced concrete caissons by using stationary slipform, Aerogo heavy lift and transfer system, and the floating dock. Seow Kiat-Chuan, PEng, MSc, BEng CPG Consultants Pte. Ltd Choi Sung-Pil, BSc, MKSCE CPG Consultants Pte. Ltd Pang Poh Yong, PEng, BEng, PGD CPG Consultants Pte. Ltd Jimmy Tsen Chee Nam, BEng, MSc (Civ Eng), MSc (Highw Eng) CPG Consultants Pte. Ltd Lim Peng-Hong. MConsE, MSc, DIC, PEng, MIES, BEng CPG Consultants Pte. Ltd

Author(s): Kiat-Chuan, Seow;Sung-Pil, Choi;Yong, Pang Poh;Nam, Jimmy Tsen Chee;Peng-Hong, Lim

Keywords: caissons;reinforced concrete;jurong island, singapore;fabricating;slipforming;aerogo system;launching