The Structural Engineer > Archive > Volume 9 (1931) > Issues > Issue 5 > The Erection of Sydney Harbour Bridge
Name of File 1305-09-05.pdf cached at 16/12/2017 22:40:30 - with 14 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\10\10b609e2-13b8-416a-83ef-3f72f9af1bd8.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\10b609e2-13b8-416a-83ef-3f72f9af1bd8_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 10b609e2-13b8-416a-83ef-3f72f9af1bd8_1.png

Members/subscribers must be logged in to view this article

The Erection of Sydney Harbour Bridge

The contract for the construction of the bridge across Sydney Harbour was secured in 1924 by Dorman Long & Co., Ltd ., and the accepted design embraces 10 steel girder approach spans, five on each side of the harbour -and an arch span of 1,650 ft. over the harbour, the total 1ength of the steel construction, including the approach spans, being 3,770 ft. J. Stuart Lewis

Author(s): Lewis, J Stuart