The Structural Engineer > Archive > Volume 91 (2013) > Issues > Issue 8 > Managing Health & Safety Risks (No. 19): Temporary works design and management
Name of File H-S.pdf cached at 16/12/2017 18:42:00 - with 1 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\b1\b1ecfe3e-14fa-49fc-9b24-5ddcab6d3343.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\b1ecfe3e-14fa-49fc-9b24-5ddcab6d3343_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: b1ecfe3e-14fa-49fc-9b24-5ddcab6d3343_1.png

Members/subscribers must be logged in to view this article

Managing Health & Safety Risks (No. 19): Temporary works design and management

An overview of the importance of temporary works (as evidenced by the significant number of historical failures) and the roles of both temporary and permanent works designers.

Author(s): The Institution of Structural Engineers' Health and Safety Panel