Name of File CBDC-6.pdf cached at 15/12/2017 16:11:12 - with 5 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\5f\5f157dbd-1c1a-41b5-a3d6-a7faec66f505.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\5f157dbd-1c1a-41b5-a3d6-a7faec66f505_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 5f157dbd-1c1a-41b5-a3d6-a7faec66f505_1.png

Members/subscribers must be logged in to view this article

Concrete Bridge Design and Construction series. No. 6: Concrete bridge construction methods – in situ

In situ options tend to be used on projects where the speed of construction is not critical, or where the lower costs of the in situ works justify a slightly longer programme.

Author(s): Concrete Bridge Development Group (CBDG)