Author: The Concrete Centre
1 June 2015
Standard: £10 + VATMembers/Subscribers: Free
Members/Subscribers, log in to access
The Concrete Centre
The Structural Engineer, Volume 93, Issue 6, 2015, Page(s) 6
This short note highlights some of the salient aspects of the design and construction of liquid-retaining structures in reinforced concrete. The guidance is based on Eurocodes BS EN 1992-1-11 and BS EN 1992-32 and the corresponding UK National Annexes.
The design for horizontal actions, fire and materials is considered, along with simplified methods of design. Throughout this article the Nationally Determined Parameters (NDPs) from the UK National Annexes have been used. These enable Eurocode 6 (BS EN 1996-1-1) to be applied in the UK.
Post-tensioned (PT) concrete floors are now widely used in the UK, particularly for high-rise buildings. This article provides information on how to scheme a PT slab and how the use of post-tensioning affects the rest of the structure. A more detailed guide to the design of PT floors can be found in The Concrete Society's Technical Report 43 (TR43): Post-tensioned concrete floors: Design handbook.