Complete issue (July 2015)

Author: Various

Date published

1st July 2015

First published: 1st July 2015

Price

Standard: £25 + VAT
Members/Subscribers: Free

Buy Now

Added to basket

Back to Previous

Complete issue (July 2015)

The Structural Engineer
Complete issue (July 2015)
Date published

1st July 2015

First published

1st July 2015

Author

Various

Price

Standard: £25 + VAT
Members/Subscribers: Free

Buy Now

All articles published in the July 2015 issue.

Additional information

Format:
PDF
Pages:
68
Publisher:
The Institution of Structural Engineers

Tags

Issue 7

Related Resources & Events

The Structural Engineer
Viewpoint: What’s up with γM1?

Viewpoint: What’s up with γM1?

There are moves afoot to add 10% more metal to every column in a building that is designed to Eurocode 3, Alastair Hughes explains.

Date - 1st July 2015
Author - A. Hughes
Price - £9
The Structural Engineer
Early-stage BIM for CERN’s Future Circular Collider studies

Early-stage BIM for CERN’s Future Circular Collider studies

Authors from Arup and CERN describe their development of the Tunnel Optimisation Tool (TOT) - an early-stage BIM tool created to make maximum use of data when performing site feasibility and tunnel alignment studies for the planned Future Circular Collider.

Date - 1st July 2015
Author - Yung Loo, Matt Sykes and Craig Sturzaker (Arup) and John Osborne and Charlie Cook (CERN)
Price - £9
The Structural Engineer
Wedded to our tools: why expertise can hold us back (part 2)

Wedded to our tools: why expertise can hold us back (part 2)

Sean Brady concludes this two-part article with a warning to engineers not to become over-reliant on their ‘tools’, but to consider how and when to apply them.

Date - 1st July 2015
Author - S.Brady (Brady Heywood)
Price - £9