The Structural Engineer > Archive > Volume 93 (2015) > Issue 7 > Bond Street Station Upgrade – using 3D analysis to optimise tunnel design
Name of File Bond-Street.pdf cached at 17/12/2017 02:30:20 - with 3 pages. pdfPath: E:\k9.istructe.org\CMS\webtest\files\24\248cb740-1221-441e-b816-34cf00bee11f.pdf. thumbPath: E:\k9.istructe.org\CMS\webtest\files\pdfthumbs\248cb740-1221-441e-b816-34cf00bee11f_1.png. objDoc: 1 - True. objPreview.Log: . strFileName: 248cb740-1221-441e-b816-34cf00bee11f_1.png

Members/subscribers must be logged in to view this article

Bond Street Station Upgrade – using 3D analysis to optimise tunnel design

Stephen Chadwick, of Dasssault Systèmes, explains how 3D numerical analyses were performed in order to model and simulate the major construction sequences ahead of the main tunnelling works during the complex Bond Street Station Upgrade project in London.

Author(s): S. Chadwick (EuroNorth, Dassault Systèmes)