Temporary Works Toolkit. Part 1: An introduction to temporary works for the structural engineer

Author: T. Lohmann (Wentworth House Partnership)

Date published

3 October 2016

Price
Free
Back to Previous

Temporary Works Toolkit. Part 1: An introduction to temporary works for the structural engineer

Tag
Author
T. Lohmann (Wentworth House Partnership)
Date published
3 October 2016
Price
Free
The Structural Engineer
Author

T. Lohmann (Wentworth House Partnership)

Citation

The Structural Engineer, Volume 94, Issue 10, 2016, Page(s) 2

Date published

3 October 2016

Author

T. Lohmann (Wentworth House Partnership)

Citation

The Structural Engineer, Volume 94, Issue 10, 2016, Page(s) 2

Price

Free

Tim Lohmann of the Temporary Works Forum introduces this new series and summarises some key differences from permanent works.

Synopsis

The Temporary Works Toolkit is a series of articles aimed primarily at assisting the permanent works designer with temporary works issues. Buildability – sometimes referred to now as “construction method engineering” – is not a new concept and one always recognised as vital to the realisation of one’s ideas; it ought to be at the forefront of an engineer’s mind.

Additional information

Format:
PDF
Pages:
2
Publisher:
The Institution of Structural Engineers

Tags

Temporary Works Toolkit Professional Guidance Issue 10

Related Resources & Events

The Structural Engineer
<h4>Editorial: Economic and safe design of the construction method</h4>

Editorial: Economic and safe design of the construction method

The 'Temporary Works Toolkit' will describe the issues and current practice in temporary works and construction method engineering.

Date – 3 October 2016
Author – B. Hewlett
Price – Free
The Structural Engineer
<h4>West Gate Bridge collapse – the story of the box girders</h4>

West Gate Bridge collapse – the story of the box girders

Sean Brady relates the failure of several box-girder bridges of the 1960s and 1970s and explains how these led to new design rules and workmanship guidance.

Date – 3 October 2016
Author – S. Brady (Brady Heywood)
Price – £10
The Structural Engineer
<h4>Engineer’s Guide to PI Claims. Part 9: Settlement agreements</h4>

Engineer’s Guide to PI Claims. Part 9: Settlement agreements

Our series from Griffiths & Armour offers a brief introduction to reaching a negotiated settlement over a professional indemnity claim.

Date – 3 October 2016
Author – Griffiths & Armour
Price – £10