Verulam (readers' letters - April 2016)

Author: Various

Date published

1 April 2016

Price

Standard: £9 + VAT
Members/Subscribers: Free

Buy Now
Back to Previous

Verulam (readers' letters - April 2016)

The Structural Engineer
Verulam (readers' letters - April 2016)
Date published

1 April 2016

Author

Various

Price

Standard: £9 + VAT
Members/Subscribers: Free

Buy Now
Author

Various

This month's letters consider the division of responsibilities when designing steel frames and connections, as well as ways to attract school-leavers to the structural engineering profession.

Additional information

Format:
PDF
Pages:
2
Publisher:
The Institution of Structural Engineers

Tags

Issue 4

Related Resources & Events

The Structural Engineer
<h4>Soil Mechanics Fundamentals (Book review)</h4>

Soil Mechanics Fundamentals (Book review)

Tom Shire finds the “less is more” approach of this book appealing to students looking for a straightforward and accessible textbook, but suspects UK undergraduates would prefer a book written specifically for a British audience.

Date - 1 April 2016
Author - T. Shire
Price - Free
The Structural Engineer
<h4>Nicaragua, Panama and the dream of a canal (part 1)</h4>

Nicaragua, Panama and the dream of a canal (part 1)

With Nicaragua planning a new canal to link the Atlantic and Pacific, Sean Brady considers the lessons of the Panama Canal when engineers face up to nature on such a grand scale.

Date - 1 April 2016
Author - S. Brady (Brady Heywood)
Price - £9
The Structural Engineer
<h4>Engineering towards a resilient world – managing client expectations</h4>

Engineering towards a resilient world – managing client expectations

Traditionally, extreme events were predominantly considered for structures where there was a high probability of such events occurring, due to their type and location, or where their failure would have a major consequence e.g. offshore structures or nuclear reactors. Clients for such structures are knowledgeable and confident in defining the event parameters and the performance requirements of their structures both during and just after hazard events. This is based on a rigorous understanding of risk, consequence and the costs associated with lack of resilience and post-event clean-up. Stakeholders and clients fresh to the subject can struggle to assess the criticality of their asset and set appropriate design requirements for extreme events such as an earthquake, flood, extended fire and explosion, without understanding the subtleties of designing for resilience. Neglecting to engage with this at project inception, before design requirements are determined and procurement is initiated, can lead to unrealistic or caveated tender returns and ultimately fail to achieve a resilient infrastructure solution.

Date - 1 April 2016
Author - K. Navaratnarajah (Mott MacDonald)
Price - £9