Heathrow Airport Terminal 2B, Phase 2

Author: Dean Podesta

Date published

2 May 2017

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Heathrow Airport Terminal 2B, Phase 2 – a new pier facility constructed in an operational airside environment

Tag
Author
Dean Podesta
Date published
2 May 2017
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Dean Podesta

Citation

The Structural Engineer, Volume 95, Issue 5, 2017, Page(s) 16-25

Date published

2 May 2017

Author

Dean Podesta

Citation

The Structural Engineer, Volume 95, Issue 5, 2017, Page(s) 16-25

Price

Standard: £10 + VAT
Members/Subscribers: Free

This article describes how a complex pier facility for Heathrow Airport Terminal 2B, Phase 2 was designed and constructed on-site and next to passenger aircraft operations.

Synopsis
With London's Heathrow Airport recently celebrating its 70th year of commercial operation and looking forward to further expansion, this paper describes a major contribution to its passenger handling infrastructure.

As part of the redevelopment of the eastern side of Heathrow Airport, destined to become the new Terminal 2 (The Queen's Terminal), Mott MacDonald was appointed to deliver the civil and structural engineering scheme and detailed design for an operationally complex pier, intended to serve 10M passengers a year.

The new pier was delivered on a physically constricted site inside the high-security (airside) zone of this major international airport. Building in such a location creates a singular set of conflicting demands, headed by the need to minimise the risks to aircraft operations through carefully planned and executed construction operations that avoid potential security breaches or alarms. This manifests itself in increased logistical challenges, including the need to security screen all staff, plant and materials entering the construction site, manage the execution of major construction works next to passenger aircraft operations, and overcome the effects of aircraft noise on safe working practices.

These exacting circumstances demanded an equally singular design approach, focused on the use of appropriate, dependable, on-site construction methods and maximising off-site fabrication. All this was to be achieved while working with the architect to create a passenger experience consistent with a leading international hub airport.

Additional information

Format:
PDF
Pages:
16-25
Publisher:
The Institution of Structural Engineers

Tags

Airport Project Focus Issue 5

Related Resources & Events

The Structural Engineer
General view of Jewel Changi Airport, Singapore

Jewel Changi Airport: a destination in its own right

How the world's largest gridshell-enclosed building was designed and constructed in Singapore.

Date – 8 September 2022
Author – Cristobal Correa
Price – £10
The Structural Engineer
<h4>And finally... (May 2017)</h4>

And finally... (May 2017)

This month's question on tension forces in a canopy has been provided by Institution Member Hugh Morrison.

Date – 2 May 2017
Author – Hugh Morrison
Price – £10
The Structural Engineer
<h4>Library update: Researching product literature</h4>

Library update: Researching product literature

The IStructE Library provides an update on researching product literature, including codes, standards and handbooks.

Date – 2 May 2017
Author – Rob Thomas
Price – £10