PROJECT DESCRIPTION

A sophisticated piece of engineering analysis allowed the reuse of vast amounts of existing infrastructure. The new Elizabeth Line includes existing above ground sections installed with new overhead line equipment supported by gantries of up to 70 years old. Engineering analysis led to most of the existing structures being safely retained. This resulted in significant programme and cost savings.
 

Submitted in 2020

Judge's comment:

Conventional analysis had determined that the majority of the existing structures could not be retained due to the new higher loadings, but the engineering team here took on the project and used structural engineering excellence to maximise the number of structures retained.

Through the use of detailed non-linear structural analysis, they demonstrated that a vast amount of existing infrastructure was suitable to be incorporated into the new Elizabeth Line with minimal or even no intervention.  The consequential cost and environmental savings were significant. 

The judges were impressed by the rigorous assessment procedure developed and how sophisticated structural analysis methods were utilised to justify many of the existing structures and to design simple strengthening measures on others. 

Contact us

Telephone: +44 (0)20 7235 4535
Email: [email protected]

Social media

      

© Copyright 2021 - The Institution of Structural Engineers, 47-58 Bastwick Street, London, EC1V 3PS, United Kingdom
Registered with the Charity Commission for England and Wales No. 233392 and in Scotland No. SC038263