Morpheus Hotel

Structural Designer

BuroHappold Engineering

Client Name

Melco Resorts

Location

Macau, China

PRINCIPAL CONTRACTOR
Dragages Hong Kong

ARCHITECT
Zaha Hadid Architects

KEY CONTRACTORS
Kyotec Group - Facade contractor
Tony Gee - Temporary works engineer
FDL GSI - Steelwork fabricator Images: © Virgile Simon Bertrand (1+2)

PROJECT DESCRIPTION

The fifth tower in Macau’s ‘City of Dreams’ leisure and entertainment complex stands 160m high. The hotel accommodation is arranged around a core in each wing of the building.

The exoskeleton structure of the building works with two concrete cores, providing the main vertical and horizontal load-bearing elements and upholding the client’s vision for a unique building. 

Judge's comment:

The Morpheus Hotel was recognised by the judges as being a forerunner in the new digital era of construction. The entire project from the initial visualisation of form, through the evolutionary development, analysis and design of different viable structural options, to the optimisation and bespoke manufacturing of the structural components and the control of their sequenced erection on site, could not have been accomplished without the formidable range of digital and communicational skills that characterise the structural engineer of today.
When the unknown can be made known, the impossible can become possible, and the value of the structural engineer is revealed in its true light. We look forward to the next step into the unknown!

Contact us

Telephone: +44 (0)20 7235 4535
Email: [email protected]

Social media

      

© Copyright 2019 - The Institution of Structural Engineers, 47-58 Bastwick Street, London, EC1V 3PS, United Kingdom
Registered with the Charity Commission for England and Wales No. 233392 and in Scotland No. SC038263