Author: Chana, Pal;Campbell, Peter
N/A
Standard: £10 + VATMembers/Subscribers: Free
Members/Subscribers, log in to access
Chana, Pal;Campbell, Peter
The Structural Engineer, Volume 78, Issue 2, 2000
The 2nd Millennium ended with considerable publicity for major engineering works on TV and in the media. The Dome, the Wheel, earthquake effect on bridges, all received extensive coverage, and engineering topics for once provided widespread after-dinner discussion among non-engineers. Have members discerned a greater general interest as a result of this higher profile for engineering matters?
Dr J. G. M. Wood (F)(Structural Studies & Design Ltd) The complex build-up of the cable-stays with multiple strands in the PE pipes with cement grouting and then wrapping at Houston (Fig 15 in the paper) contrasts with the simple, spiral strand wire ropes traditionally used for cable-stayed bridges and suspension-bridge hangers in the UK. I was involved in the retensioning and replacement of cable-stays on the Wye and Erskine Bridges and the early replacement of hangers on the Severn Bridge. The problems experienced on these bridges included creep of the cables due to bedding-in of the spiral strands necessitating retensioning (e.g. Erskine Bridge sagged by about 750mm because of cable-stay creep). The fatigue problems at the lower socket ends of some of the hangers on the Severn Bridge were associated with high axial stress ranges and secondary bending effects, which can be avoided with more appropriate design and detailing. Similarly, the local socket neck strand corrosion problems experienced can be avoided by improved detailing without the elaboration of wedge anchors and grouting used in the VSL system. Because the socketed hangers were inspectable and replaceable, the problems were picked up early and remedied.
Jurong Port, one of the region’s leading industrial deep-water ports, is Singapore’s main gateway for bulk and industrial cargo. The port has 23 berths, totalling 4.4km of berth length, and handles about 14Mt of cargo each year. In 1997, 7200 vessels called at the port. An overall view of the port’s berth layout is shown in Fig 1. C.S. Ong, W.Y. Mao and S.T. Wong