Caisson fabrication and launching

Author: Kiat-Chuan, Seow;Sung-Pil, Choi;Yong, Pang Poh;Nam, Jimmy Tsen Chee;Peng-Hong, Lim

Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Caisson fabrication and launching

Tag
Author
Kiat-Chuan, Seow;Sung-Pil, Choi;Yong, Pang Poh;Nam, Jimmy Tsen Chee;Peng-Hong, Lim
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Kiat-Chuan, Seow;Sung-Pil, Choi;Yong, Pang Poh;Nam, Jimmy Tsen Chee;Peng-Hong, Lim

Citation

The Structural Engineer, Volume 81, Issue 15, 2003

Date published

N/A

Author

Kiat-Chuan, Seow;Sung-Pil, Choi;Yong, Pang Poh;Nam, Jimmy Tsen Chee;Peng-Hong, Lim

Citation

The Structural Engineer, Volume 81, Issue 15, 2003

Price

Standard: £10 + VAT
Members/Subscribers: Free

The Jurong Island formed by the amalgamation of seven existing islands off Jurong was an attempt by the Singapore Government to create a world class petroleum and chemical industry on the island. The design and construction of a road link to connect the Jurong Island to the mainland was completed with a series of precast gravity caissons. The foundation of the caissons consisted of a layer of stone sill on prepared seabed using dredging. In view of the short overall contract period (24 months), it was most important to ensure that the 96 reinforced concrete caissons be fabricated and installed on time without causing any delay to the subsequent activities such as sand filling which was forming the core of the causeway. Based on the detailed scheduling, it required 12 months to fabricate the 96 caissons. Therefore special fabrication and launching methods were used to overcome the extremely short construction period. This paper describes the construction methods adopted in this project for the fabrication, moving and launching of reinforced concrete caissons by using stationary slipform, Aerogo heavy lift and transfer system, and the floating dock.

Seow Kiat-Chuan, PEng, MSc, BEng CPG Consultants Pte. Ltd

Choi Sung-Pil, BSc, MKSCE CPG Consultants Pte. Ltd

Pang Poh Yong, PEng, BEng, PGD CPG Consultants Pte. Ltd

Jimmy Tsen Chee Nam, BEng, MSc (Civ Eng), MSc (Highw Eng) CPG Consultants Pte. Ltd

Lim Peng-Hong. MConsE, MSc, DIC, PEng, MIES, BEng CPG Consultants Pte. Ltd

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 15

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Price – £10
The Structural Engineer
<h4>Keppel Harbour re-development - vertical seawall system</h4>

Keppel Harbour re-development - vertical seawall system

In Singapore, there is an increasing awareness that the waterfront is an asset and the proximity to the water adds value to developments. Relocation of facilities and re-zoning of land to optimise usage in the limited space available has been part of urban planning in the island for some time. Land reclamation is becoming more and more necessary not only to increase land masses for the growing population but also to create lifestyle living and cater to an increasingly affluent society. Redevelopment of the existing Keppel Shipyard into a proposed residential, recreational and commercial area is one such development to maximise the use of land next to water. Location of the site adjacent to a calm and well sheltered harbour at the fringe of the open sea makes it unique and ideal site for exciting waterfront housing and gracious lifestyle. This prime site has a 1000m long waterfront with water access on two sides and spectacular views out to sea. The deep water conditions of the natural harbour theoretically does not lend itself readily to land reclamation. However, because space is tight and seafront proximity is precious, reclamation in this instance required a vertical seawall system to optimise frontage i.e. to bring the future development closer to the water. The appropriate system also needs to be robust and resilient so as to protect the land and the expected high cost of investment immediately behind it for many years to come. This paper presents the vertical seawall system used and the rationale for its selection. General design parameters and performance criteria are discussed. Special design considerations related to its performance requirement are highlighted. Construction techniques and methods used are presented. Kok Kim Lim, BEng, MEngSc, PE (S’pore), MIE Aust Serena Mui Cheng Yap, B.Eng (Civil) Hons, MIES, MSSSS Jacob Jordanus, B.Eng All T Y Lin South East Asia Pte Ltd

Author – Lim, Kok Kim;Yap, Serena Mui Cheng;Jordanus, Jacob
Price – £10