Skip to main content
The Institution of Structural Engineers
The Institution of Structural Engineers
Find an Engineer
My Account
Log In
Search
Shopping Cart
0
Items
Latest news
Home
Events
Resources
Browse our resources
Building Safety Act
Business support
Climate emergency
Design and Construction
Technology and digital
Jobs board and Careers Hub
Resilience
Library services
Reinforced Autoclaved Aerated Concrete (RAAC)
Safety of society
Teaching resources
The Structural Engineer
Membership
Find out more about membership
Student Membership
Graduate Membership
Chartered Membership
Fellow
Technician Membership
Incorporated-Membership
Associate
Affiliate Membership
Does my degree fit?
How do I become Chartered?
Training and development
Overview of Training & Development
Initial Professional Development (IPD)
Continuing Professional Development (CPD)
Membership exams
Courses
Qualifications and registrations
Apply for grants
Enter awards
Mentoring
Jobs
Pan-African Knowledge
partnership
Become a Structural Engineer
Explore Become a Structural Engineer
What is a structural engineer?
What is it like to be a structural engineer?
How to become a structural engineer
Get Involved
Ways to get involved
Young Member Groups
Committees
Panels
Regional Groups
Study Groups
Supported Organisations
Become an IStructE Expert Witness
Sponsors
Online Community
Speak at IStructE events
Shop
Find an Engineer
My Account
Log In
Search
Shopping Cart
0
Items
Back to Previous
Issue 10
Close
Tag
Author
Date published
Price
Buy Now
PDF
Print
Close
Contents page
The Structural Engineer
Guidance note: A guide to acronyms
Read more
The Structural Engineer
Interview: Top IStructE exams scorer reveals
Read more
The Structural Engineer
Profile: Frei Otto’s life’s work: an inspiration for all
Read more
The Structural Engineer
Report: Confidential reporting on structural safety
Read more
The Structural Engineer
Steel channel and hollow block floor slabs
The domestic and light industrial floor market in South Africa comprises a floor system referred to as the rib and block floor slab. The floor system is a concrete composite, composed of in situ concrete, precast ribs and hollow block void formers. The system is noted for its speed of construction and formwork is not required. However, transportation costs of the precast ribs and the need for lifting equipment renders the system uneconomical beyond a limited radius from the factory. To minimise costs, a new system is proposed, which replaces the precast rib with a cold-formed lipped channel. A set of design equations, adapted from the code, are compared with a set of experiments. The investigation indicated the proposed system is a viable alternative, but embossment or means to mechanically bond the concrete to the steel is required to achieve composite action. M. Gohnert, BSc, MEM, PhD, CEng, Pr Eng, AIStructE University of the Witwatersrand, South Africa M. J. Komakec, BSc, GDE, MSc University of the Witwatersrand, South Africa
Read more
The Structural Engineer
Improved crack width calculation method to BS 8007 for combined flexure and direct tension
Publish Date
– 17 May 2005
Read more
The Structural Engineer
Verulam
Read more
Item Added to basket
Go to checkout
or continue shopping