Redevelopment of Drapers' Gardens, London

Author: Ian Blunn, Kimbell Grady and Hugh Taylor

Date published

1 April 2012

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

The Institution of Structural Engineers The Institution of Structural Engineers
Back to Previous

Redevelopment of Drapers' Gardens, London

Tag
Author
Ian Blunn, Kimbell Grady and Hugh Taylor
Date published
1 April 2012
Price

Standard: £9.95 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Ian Blunn, Kimbell Grady and Hugh Taylor

Citation

The Structural Engineer, Volume 90, Issue 4, 2012, Page(s) 22-28

Date published

1 April 2012

Author

Ian Blunn, Kimbell Grady and Hugh Taylor

Citation

The Structural Engineer, Volume 90, Issue 4, 2012, Page(s) 22-28

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

This article discusses the piled foundations and archaeological investigations involved in the redevelopment of Drapers' Gardens, London, in a confined city site.

Synopsis

The Drapers' Gardens redevelopment, completed in 2011, involved the construction of an office building in the Bank Conservation Area within the City of London. The confined city site and the ground conditions presented a number of challenges. The site activities commenced with the demolition of the existing 100m high tower structure. At the time it was the tallest office structure to be demolished in the UK. The perimeter support of the substructure was designed to minimise internal propping. The piled foundations re-used a substantial number from the existing piled raft. 

Archaeological investigations uncovered an extensive area of preserved Roman development and water channels. The building obtained an excellent BREEAM rating which influenced the services and façade design. This led to demands on the structural design. The steel framed structure above ground is a distinctive stepped form rising to 15 storeys with spans up to 15m to satisfy the developer's desire for column-free spaces. The staircases on the south façade are a visible feature. Close working within the multi-disciplinary design team and with the main contractor ensured this complex project was efficiently completed.

Additional information

Format:
PDF
Pages:
22-28
Publisher:
The Institution of Structural Engineers

Tags

Project Focus Issue 4

Related Resources & Events

The Structural Engineer
<h4>The creation of a living laboratory for structural engineering at the National University of Ireland</h4>

The creation of a living laboratory for structural engineering at the National University of Ireland

This paper outlines the instrumentation of the structural elements within the New Engineering Building at the National University of Ireland, Galway and the part they will play in the teaching and understanding of structural engineering within the university.

Date – 1 April 2012
Author – Jamie Goggins, David Byrne and Eamonn Cannon
Price – £9.95
The Structural Engineer
<h4>Regional Group Profile (Caribbean)</h4>

Regional Group Profile (Caribbean)

Covering a vast geographical area hasn't prevented the Caribbean group from working towards common goals...

Date – 1 April 2012
Author – Various
Price – £9.95
The Structural Engineer
<h4>Verulam (readers' letters – April 2012)</h4>

Verulam (readers' letters – April 2012)

This month's letters discuss wind loading codes, drawing practice and the January 2012 issue's Cairo Expo City article.

Date – 1 April 2012
Author – Various
Price – £9.95