This article highlights the considerable benefits of adopting a standard pile schedule for Eurocode design.
This article examines the prestressing for a concrete bridge. Prestressing enhances the capacity of a member that is weak in tension, but strong in compression. It effectively creates a new material that is strong in tension. A prestressed bridge has much less steel to be handled, which reduces congestion, leading to easier and quicker concrete placing.
A new series from the Steel Construction Institute (SCI) begins with a look at the history of composite construction and the development of Eurocode 4.