And finally... (July 2018)

Author: E. Macpherson

Date published

2 July 2018

First published: 2 July 2018

Price
Free
Access Resource

Added to basket

Back to Previous

And finally... (July 2018)


The Structural Engineer
And finally... (July 2018)
Date published

2 July 2018

Author

E. Macpherson

Price

Free

First published

2 July 2018

Access Resource
Author

E. Macpherson

This month we present a reader contribution from Ewan Macpherson on shear forces.

Additional information

Format:
PDF
Pages:
1
Publisher:
The Institution of Structural Engineers

Tags

At the back Issue 7

Related Resources & Events

The Structural Engineer
Spotlight on Structures (July 2018)

Spotlight on Structures (July 2018)

This month we are delighted to announce the winners of the 2018 Structures prizes. Congratulations to Andrew Liew, Leroy Gardner and Philippe Block on winning the ‘Best Research Paper Prize’ for their paper on ‘Moment-Curvature-Thrust Relationships for Beam-Columns’ published in Volume 11, August 2017. We also congratulate Chris Burgoyne and Owen Mitchell on winning the ‘Best Research into Practice Paper Prize’ for their paper on ‘Prestressing in Coventry Cathedral’ published in Volume 11, August 2017. Both papers will be free to read until 7 September 2018. The annual Structures prizes are judged by The Institution of Structural Engineers Research Panel and supported by Elsevier. Each prize carries an award of £500.

Date - 2 July 2018
Author - Various
Price - Free
The Structural Engineer
Diary dates (July 2018)

Diary dates (July 2018)

Upcoming events at HQ and around the Regional Groups.

Date - 2 July 2018
Author - Various
Price - Free
The Structural Engineer
Damage assessment and monitoring for buildings on the Elizabeth line

Damage assessment and monitoring for buildings on the Elizabeth line

The Elizabeth line, due to open in December 2018, crosses London from west to east. The Crossrail project to construct the Elizabeth line has seen 21km of twin-bored tunnels constructed under central London, with eight new stations built on this section. The damage assessment and monitoring carried out comprised a significant element of work in terms of the resources involved, both human and financial. The background to this work was the experience from a number of tunnelling projects in London, probably most significantly that from the London Underground Jubilee line extension. While all assets along the alignment were subject to the same process, the impact of the works around the stations and shafts was calculated to be greater than along the bored tunnels, and the extent of instrumentation and monitoring was correspondingly higher. Both automated and manual methods were used, with instrumentation installed and readily visible on many buildings in these areas throughout the duration of the works. This paper looks at the damage assessment and monitoring of buildings around the stations, focusing in particular on the new station at Tottenham Court Road. It also provides an overview of the two very different tunnel construction methods used on the project – the so-called tunnel boring machine (TBM) and sprayed concrete lining (SCL) methods – and describes how these lead to the ground movement that is the principal source of potential damage to the buildings. Finally, the paper considers briefly some of the lessons learned and how these might be applied to future urban tunnelling projects.

Date - 2 July 2018
Author - D. Lazarus (Arup) and H-I Jung (Arup)
Price - Free