CROSS Safety Report: Poor retaining wall design

Author: Collaborative Reporting for Safer Structures

Date published

1 July 2025

Price
Free
The Institution of Structural Engineers The Institution of Structural Engineers
Back to Previous

CROSS Safety Report: Poor retaining wall design threatens stability of a multistorey steel-framed building

Tag
Author
Collaborative Reporting for Safer Structures
Date published
1 July 2025
Price
Free
The Structural Engineer
Author

Collaborative Reporting for Safer Structures

Citation

The Structural Engineer, Volume 103, Issue 7, 2025, Page(s) 18-19

Date published

1 July 2025

Author

Collaborative Reporting for Safer Structures

Citation

The Structural Engineer, Volume 103, Issue 7, 2025, Page(s) 18-19

Price

Free

This month's report concerns a poorly designed retaining wall, immediately adjacent to a steel-framed multistorey building, which deflected and imposed significant lateral geotechnical loads into the building's superstructure.

Additional information

Format:
PDF
Pages:
18-19
Publisher:
The Institution of Structural Engineers

Tags

Multi-storey - tall structure Safety Wall Professional Guidance Issue 7

Related Resources & Events

The Structural Engineer
Soil pipe passing through notched and unreinforced floor joist showing wires and pipework

CROSS Safety Report: Alterations to spine wall and joists result in structural issues

This month's report details the structural damage in a listed building after alterations that involved moving a spine wall and notching timber joists.

Date – 1 May 2026
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
Image showing cracks in a pavement

CROSS Safety Report: Undermining retaining walls adjacent to highways

This month's report raises concerns about incidents involving retaining walls that support the highway.

Date – 2 June 2025
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
View of transfer beams being removed from office building in Singapore

Enhanced demolition strategy for a 29-storey office building with mega transfer beams in Singapore

This article presents the demolition strategy adopted for a 29-storey office tower in a highly built-up city area in Singapore.

Date – 1 July 2025
Author – K. Murugappan, Catherine Wong Chi Fun, Ngan See Pyng and Tan Chee Siew
Price – £9.95