Case study: From fixed to pinned: modifying a column base detail to raise a steel shed height by 50%

Author: Nabeel Al-Ayish

Date published

3 September 2025

Price
Standard: £9.95 + VAT
Members/Subscribers: Free
The Institution of Structural Engineers The Institution of Structural Engineers
Back to Previous

Case study: From fixed to pinned: modifying a column base detail to raise a steel shed height by 50%

Tag
Author
Nabeel Al-Ayish
Date published
3 September 2025
Price
Standard: £9.95 + VAT
Members/Subscribers: Free
The Structural Engineer
Author

Nabeel Al-Ayish

Citation

The Structural Engineer, Volume 103, Issue 9, 2025, Page(s) 33-36

Date published

3 September 2025

Author

Nabeel Al-Ayish

Citation

The Structural Engineer, Volume 103, Issue 9, 2025, Page(s) 33-36

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

This article describes a project to increase the height of three steel-framed warehouses in Iraq to expand their food-storage capacity and the unusual engineering challenges presented.

Additional information

Format:
PDF
Pages:
33-36
Publisher:
The Institution of Structural Engineers

Tags

Industrial Extension Project Focus Issue 9

Related Resources & Events

The Structural Engineer
The finished building for Mary Ward Adult Education Centre

Mary Ward Centre, London: Risk management of a heavy retrofit and vertical extension

Alison Wallis and Mike Davies outline how a derelict 1970s concrete-framed building was repurposed in Stratford, east London.

Date – 3 March 2025
Author – Alison Wallis and Mike Davies
Price – £9.95
The Structural Engineer
Image showing red steel box frame after installation

Remodelling and extending a detached dwelling in Docklands, East London: foundation challenges

This article discusses a residential project involving the extensive remodelling and extension of an existing property to create a larger, more spacious and functional home for a young family.

Date – 1 August 2024
Author – Ameet Mistry
Price – £9.95
The Structural Engineer
View of North Neighbourhood office building after redevelopment across Bristol harbour

Neighbourhood North: maximum gain, minimum pain – transformational office redevelopment

This article explores the project aims, challenges, solutions and lessons learned in redeveloping an existing 1980s quayside office block in southwest England.

Date – 3 June 2024
Author – Claire Thomas, Maria Schaerer and Holly Stephenson
Price – £9.95