CROSS Safety Report: Overestimation of lateral torsional buckling restraints

Author: Collaborative Reporting for Safer Structures

Date published

3 September 2025

Price
Free
Back to Previous

CROSS Safety Report: Overestimation of lateral torsional buckling restraints

The Structural Engineer

Author

Collaborative Reporting for Safer Structures

Citation

The Structural Engineer, Volume 103, Issue 9, 2025, Page(s) 28-29

Date published

3 September 2025

Author

Collaborative Reporting for Safer Structures

Citation

The Structural Engineer, Volume 103, Issue 9, 2025, Page(s) 28-29

Price

Free

This month's report relates to a concern about the load capacity of a new temporary structure designed by another firm.

Additional information

Format:
PDF
Pages:
28-29
Publisher:
The Institution of Structural Engineers

Tags

Metal - steel Safety Buckling Professional Guidance Issue 9

Related Resources & Events

The Structural Engineer
3D sketch of connection detail

CROSS Safety Report: Unusual steelwork connection discovered during fit-out works

CROSS Safety Report: Unusual steelwork connection discovered during fit-out works

This month's report discusses an unusual steelwork connection found during an inspection of an existing structure.
Date – 3 February 2025
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
CROSS logo

CROSS Safety Report: Connection fixity considerations for steel frame modelling

CROSS Safety Report: Connection fixity considerations for steel frame modelling

This month's CROSS Report concerns the modelling of steel frame joints when using computer programs.
Date – 1 March 2023
Author – Collaborative Reporting for Safer Structures
Price – £0
The Structural Engineer
CROSS logo

CROSS Safety Report: Fire protection of light-gauge steel frames

CROSS Safety Report: Fire protection of light-gauge steel frames

CROSS-UK was expanded to cover fire safety reporting following recommendations by Dame Judith Hackitt in her post-Grenfell report Building a Safer Future . This month we present a fire safety report illustrating the implications of substituting a product within a tested system without further testing or justification.
Date – 1 June 2022
Author – CROSS
Price – £0