Technical Guidance Note (Level 2, No. 28): Introduction to construction sequence modelling

Author: The Institution of Structural Engineers

Date published

2 July 2026

Price
Standard: £9.95 + VAT
Members/Subscribers: Free
Back to Previous

Technical Guidance Note (Level 2, No. 28): Introduction to construction sequence modelling

The Structural Engineer

Author

The Institution of Structural Engineers

Citation

The Structural Engineer, Volume 104, Issue 7, 2026, Page(s) 16-19

Date published

2 July 2026

Author

The Institution of Structural Engineers

Citation

The Structural Engineer, Volume 104, Issue 7, 2026, Page(s) 16-19

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

This note provides an introduction to construction sequence modelling with examples and advice.

Additional information

Format:
PDF
Pages:
16-19
Publisher:
The Institution of Structural Engineers

Tags

Technical Guidance Notes (Level 2) Technical Issue 7

Related Resources & Events

The Structural Engineer
Diagram showing stress and strain distribution in an idealized reinforced concrete slab across a neutral axis.

Technical Guidance Note (Level 2, No. 29): Designing reinforced concrete shear walls using FEA

Technical Guidance Note (Level 2, No. 29): Designing reinforced concrete shear walls using FEA

This two-part note sets out a simple and robust method for the design of reinforced concrete walls and cores in braced concrete using forces derived from a whole-building finite element model. Part 1 focuses on concept design, while Part 2 will cover finite element design and analysis.
Date – 9 November 2026
Author – Matt Penellum and Lloyd Bickle
Price – £9.95
The Structural Engineer
Diagrams illustrating lamination and grain discontinuity and curvature in wood beams.

Technical Guidance Note (Level 2, No. 27): Analysis modelling for mass timber structures (part 2)

Technical Guidance Note (Level 2, No. 27): Analysis modelling for mass timber structures (part 2)

This note discusses analysis modelling considerations specific to mass timber structures. Part 2 looks at element properties and types, hybrid/composite structures and connections, as well as presenting a short example.
Date – 1 May 2026
Author – The Institution of Structural Engineers
Price – £9.95
The Structural Engineer
Three diagrams showing structural steel beam connections with brackets, equal signs, and question marks representing equivalent support conditions.

Technical Guidance Note (Level 2, No. 26): Analysis modelling for mass timber structures (part 1)

Technical Guidance Note (Level 2, No. 26): Analysis modelling for mass timber structures (part 1)

This note introduces analysis modelling considerations specific to mass timber structures, highlighting unique material properties that must be considered.
Date – 1 April 2026
Author – Matt Caldwell
Price – £9.95