N/A
Standard: £10 + VATMembers/Subscribers: Free
Members/Subscribers, log in to access
The Structural Engineer, Volume 27, Issue 11, 1949
This paper describes the construction during the second World War of three sheds each of 240 feet clear span required for the production of bomber aircraft. These sheds formed part of an extension scheme to the Ministry of Aircraft Production's factory at Squires Gate Airport, Blackpool. John Gordon Faber