N/A
Standard: £10 + VATMembers/Subscribers: Free
Members/Subscribers, log in to access
The Structural Engineer, Volume 30, Issue 6, 1952
The technical business of the joint meeting was the presentation and discussion of the above paper. Unfortunately, owing to fog, Monsieur Brice was unable to reach London, as he had hoped, and the paper was presented on his behalf by M. de Jarny.
The first part of this paper describes the utilisation of " low-head " installations in the development of the hydro-electric resmrces of France, with a description of the principles and construction of the Stream-line Power Station Barrage recently completed at Templesur-Lot (Electricite de France). L.P. Brice
The paper describes two testing machines. A fullsize prototype has already been made of one of these and a demonstration model is also available. A demonstration model only is available for the other. A.C. Vivian