Alkali-Silica Reaction - a Progress Report
Date published

N/A

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

Back to Previous

Alkali-Silica Reaction - a Progress Report

The Structural Engineer

Citation

The Structural Engineer, Volume 65, Issue 9, 1987

Date published

N/A

Citation

The Structural Engineer, Volume 65, Issue 9, 1987

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

1) The formation of the Institution’s ad hoc committee (chaired by David Doran (F)) on engineering implications of alkali-silica reaction in concrete structures was announced in The Structural Engineer, December 1986. Its brief is to prepare early interim guidance on the identification, engineering appraisal and management of structures affected by alkali-silica reaction. It is envisaged that more coherent and comprehensive guidance will be prepared in about 2 years, when further results of current appraisals and research investigations are available.

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 9

Related Resources & Events

The Structural Engineer

Verulam

Verulam

Shear resistance of bend-up bars There has been quite a response to Mr Porter’s query (July) regarding the apparent anomaly in the concrete Code, in that it appears to make the shear resistance Vb, independent of the bend-up bar spacing Sb. Verulam
Price – £9.95
The Structural Engineer

The President 1987 - 1988

The President 1987 - 1988

Keith White will succeed Professor Edmund Happold, FEng, as President of the Institution 1987-1988 at an Ordinary Meeting at Institution headquarters on 1 October 1987. The handover ceremony begins at 6.oopm, when Mr White will give his Presidential Address ‘The Institution today and tomorrow?’, the full text of which will be published in The Structural Engineer in November.
Price – £9.95
The Structural Engineer

The Emergence of Reinforced Concrete, 1750 - 1910

The Emergence of Reinforced Concrete, 1750 - 1910

It is suggested that the use of reinforced concrete based on scientific analysis began in the decade 1875-1885. Before that, the medium had been used intuitively, for about 30 years, with a wide range of cements. This use in its turn had developed from the need to provide structural iron with nonstructural fireproof encasement. From 1885 to 1910 there was a rapidIy increasing perception of the behaviour and potential of reinforced concrete. The paper foIIows the emergence of this new building medium, from the middle of the 18th century, when the intimately-bonded combination of metal and concrete of any form held no meaning in building, to 1910 when it had become universally known and was being used much in the manner accepted today and in most of the form now employed. Professor John W. de Courcy
Price – £9.95