Wind tunnel takes off

Author: Stansfield, Kathy

Date published

N/A

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Wind tunnel takes off

Tag
Author
Stansfield, Kathy
Date published
N/A
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

Stansfield, Kathy

Citation

The Structural Engineer, Volume 83, Issue 22, 2005

Date published

N/A

Author

Stansfield, Kathy

Citation

The Structural Engineer, Volume 83, Issue 22, 2005

Price

Standard: £10 + VAT
Members/Subscribers: Free

Additional information

Format:
PDF
Publisher:
The Institution of Structural Engineers

Tags

Issue 22

Related Resources & Events

The Structural Engineer
<h4>Verulam</h4>

Verulam

Price – £10
The Structural Engineer
<h4>Understanding Eurospeak</h4>
The Structural Engineer
<h4>Structural platform solution for seismic arctic environments – Sakhalin II offshore facilities</h4>

Structural platform solution for seismic arctic environments – Sakhalin II offshore facilities

This paper describes the development of a technical solution for the two offshore platforms of the Sakhalin II project, in order to cope with the special characteristics of the arctic and seismic environments. The emphasis is on describing the design challenges and how they were addressed during the Front-End-Engineering-Definition leading to the concepts currently going through detailed design. Transportation and installation aspects, in such a remote environment with a limited weather window, form an integral part of concept development and needed to be addressed early on. The structural solutions for the two offshore platforms comprise a four-legged concrete gravity based structure (GBS), supporting an integrated deck that includes a seismic isolation system between topsides and GBS. In addition to providing seismic isolation, this system also effectively isolates the topsides from wave, sea ice and thermal contraction loadings and hence simplifies the design considerably. The structural concepts, which at the time of writing are at the final stages of detailed design, provide effective solutions taking due consideration of constructability, transportation, installation and operation for 30 years. Christopher S. J. Clarke, AMEC Oil and Gas Robert Buchanan, AMEC Oil and Gas Michael Efthymiou, Sakhalin Energy Investment Company Ltd Christopher Shaw, AMEC Oil and Gas

Price – £10