Belgrade’s new crossing point

Author: M. Myerscough (Cass Hayward)

Date published

1 January 2012

Price

Standard: £10 + VAT
Members/Subscribers: Free

Back to Previous

Belgrade’s new crossing point

Tag
Author
M. Myerscough (Cass Hayward)
Date published
1 January 2012
Price

Standard: £10 + VAT
Members/Subscribers: Free

The Structural Engineer
Author

M. Myerscough (Cass Hayward)

Citation

The Structural Engineer, Volume 90, Issue 1, 2012, Page(s) 5

Date published

1 January 2012

Author

M. Myerscough (Cass Hayward)

Citation

The Structural Engineer, Volume 90, Issue 1, 2012, Page(s) 5

Price

Standard: £10 + VAT
Members/Subscribers: Free

The new Sava River Crossing in Belgrade has been recently completed.
Matthew Myerscough (formerly with Paul Tanner & Associates and now with Cass Hayward) reports from Serbia on its design and construction.

Additional information

Format:
PDF
Pages:
5
Publisher:
The Institution of Structural Engineers

Tags

Project Focus Issue 1

Related Resources & Events

The Structural Engineer
<h4>Cairo Expo City – a free-form spatial roof structure</h4>

Cairo Expo City – a free-form spatial roof structure

The Exhibition Centre at the new Cairo Expo City development comprises a curved roof structure sweeping over four internal exhibition halls and covering over 180 000m2 of plan area. This project has been driven by the design team’s desire for complete integration of structure and architecture while efficiently realising a complex free-form shape. This paper presents the technical and logistical development of the roof structure, integration with architecture, operation and servicing, and the structural design and optimisation of the spatial roof truss.

Date – 1 January 2012
Author – L. Epp, K. Berry and R. Hart (Buro Happold)
Price – £10
The Structural Engineer
<h4>Scandinavian methods of construction in Scotland</h4>

Scandinavian methods of construction in Scotland

This paper presents the Scandinavian prefabricated timber and precast concrete methods of construction used to deliver the £120m Aberdeen 3Rs Schools PPP project. In particular the paper concentrates on the construction detailing of the glulaminated timber, the timber stressed skin panels and the precast concrete sandwich panels which facilitate rapid completion of a weather tight shell.

Date – 1 January 2012
Author – R. Haigh (Buro Happold)
Price – £10
The Structural Engineer
<h4>Regional Group Profile (Scotland)</h4>

Regional Group Profile (Scotland)

The Regional Group committee provides insight into the Group's successful programme of activities and plans for the future

Date – 1 January 2012
Author – Various
Price – £10