Author: Chris Wise, Andrew Weir, George Oates and Peter Winslow
7 June 2012
Standard: £9.95 + VAT Members/Subscribers: Free
Members/Subscribers, log in to access
Chris Wise, Andrew Weir, George Oates and Peter Winslow
The Structural Engineer, Volume 90, Issue 6, 2012, Page(s) 13-25
https://doi.org/10.56330/WQIF8446
DOI: https://doi.org/10.56330/WQIF8446
This paper describes how the Olympic Stadium was developed around an innovative use of permanent and temporary structures to meet the 80 000 Games spectator capacity and a 25 000 Legacy spectator capacity.
This paper describes the design and construction of The Aquatics Centre, a centrepiece of the London 2012 Olympic and Paralympic Games.
This article describes how the building shell element of the 12 000-seat temporary demountable Basketball Arena for the London 2012 games was designed and built.