Author: Matthew Revell and Roger Shaw
31 October 2013
Standard: £9.95 + VAT Members/Subscribers: Free
Members/Subscribers, log in to access
Matthew Revell and Roger Shaw
The Structural Engineer, Volume 91, Issue 11, 2013, Page(s) 60-64
https://doi.org/10.56330/HKAZ9325
DOI: https://doi.org/10.56330/HKAZ9325
This article describes the use of BIM for the Sellafield Maintenance Facility, a new mechanical handling plant that will provide operational support during waste retrieval campaigns.
This paper analyses the current issues surrounding BIM, using the Singapore Sports Hub project as a case study, comparing it with current trends from industry and the literature.
This case study documents Buro Happold's experience with the Louvre Abu Dhabi project over the last six years, and focuses on the 3D modelling and BIM aspects that have been an integral part of the project.