Author: Griffiths & Armour
27 February 2015
Standard: £9.95 + VATMembers/Subscribers: Free
Members/Subscribers, log in to access
Griffiths & Armour
The Structural Engineer, Volume 93, Issue 3, 2015, Page(s) 32-33
https://doi.org/10.56330/VYXY6382
DOI: https://doi.org/10.56330/VYXY6382
Our series from insurance broker Griffiths & Armour moves on from examining the underlying causes of claims, to consider the effects of contractual terms.
The fifth part of our series from Griffiths & Armour demonstrates how communication failures lie behind many liability claims.
In the first of a new series from insurance broker Griffiths & Armour examining contractual risks and liability claims, we look at design defects and ways to avoid them.