Expansion of the Etihad Stadium, Manchester. Part 2: Construction

Author: Paul Hulme, John Calland, Tony Hunt and Andy Baynton

Date published

1 December 2016

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

Back to Previous

Expansion of the Etihad Stadium, Manchester. Part 2: Construction

The Structural Engineer

Author

Paul Hulme, John Calland, Tony Hunt and Andy Baynton

Citation

The Structural Engineer, Volume 94, Issue 12, 2016, Page(s) 24-30

Date published

1 December 2016

Author

Paul Hulme, John Calland, Tony Hunt and Andy Baynton

Citation

The Structural Engineer, Volume 94, Issue 12, 2016, Page(s) 24-30

Price

Standard: £9.95 + VAT
Members/Subscribers: Free

This paper describes the challenges faced by the fabrication and construction teams for the South Stand expansion of the Etihad Stadium in Manchester, which was by Laing O'Rourke and Severfield.

Synopsis

The Etihad Stadium was initially constructed for the Manchester Commonwealth Games of 2002, with the original stadium comprising reinforced-concrete terrace structures that supported a lightweight cable-stayed roof. The stadium underwent a planned conversion following the games to become the 48 000-seat home of Manchester City Football Club. It opened in August 2003 in time for the first home game of the season, before officially becoming the Etihad Stadium in 2008.

In 2012, following unprecedented growth and development, the club took the decision to expand the stadium to a capacity of 55 000. In contrast to the previous conversion, the design and construction teams had to extend one end of the stadium without compromising the structural integrity of the roof to the remaining three stands.

Part 1 of this paper described the engineering design led by BuroHappold Engineering. Part 2 covers the challenges faced by the fabrication and construction teams (Laing O'Rourke and Severfield). These relate to the programme sequence and construction methodology, and resulted from the key objectives of:

  • completion of the works for the start of the 2015/16 season

  • maintaining a roof over spectators

  • no seat loss on match days during the football season

  • minimal disruption to the stadium operations

The paper will describe the inventive techniques developed to resolve these challenges, including the temporary works for erection of the roof.

Additional information

Format:
PDF
Pages:
24-30
Publisher:
The Institution of Structural Engineers

Tags

Stadium Project Focus Issue 12

Related Resources & Events

The Structural Engineer
Modern stadium with a curved, illuminated roof in blue and white, reflecting on dark water under a twilight sky.

Design of the Hill Dickinson Stadium for Everton Football Club

Design of the Hill Dickinson Stadium for Everton Football Club

This article provides an overview of the structural engineering design for Everton Football Club's new stadium.
Date – 2 July 2026
Author – Fergus McCormick, Andy Pottinger, Tim Finlay, Thomas Kember and Matthew Perry
Price – £9.95
The Structural Engineer

Designing an 'icon': redevelopment of Ireland's Curragh Racecourse

Designing an 'icon': redevelopment of Ireland's Curragh Racecourse

This article describes the concept, detailed design and delivery of the Curragh Racecourse redevelopment, in Co. Kildare, Republic of Ireland.
Date – 1 June 2022
Author – Michael Orr, Jon Leach and Eugene Sheehy
Price – £9.95
The Structural Engineer
3D model view of typical canopy rib connection to back of stand

Design and construction of the Compton and Edrich stands, Lord’s Cricket Ground redevelopment

Design and construction of the Compton and Edrich stands, Lord’s Cricket Ground redevelopment

This paper describes the key design and construction challenges of the Compton and Edrich stands – two striking additions to Lord’s Cricket Ground in London.
Date – 3 May 2022
Author – Fergus McCormick, Tim Sullivan, Iain Hill, Paul Eddleston, Mick Slack, Rajan Mistry
Price – £9.95